我的履歷表/CURRICULUM VITAE
Curriculum Vitae
Mr Weijen Lien
B.Arch, M.Arch.
Education:
Master of Architectural Studies
The University of Queensland
Australia, 1993
Bachelor of Architecture
Tamkang University
Taiwan, 1984
Proficient Languages:
Taiwanese, Mandarin and English
Interests:
Model Making, Cooking, Photography, Traveling and Baseball
Skill:
Proficiency in chemical plant P&ID and piping engineering
Proficiency in medical, hospitality, resort and chemical plant equipment layout, installation and construction
Proficiency in residential, commercial, hospitality, resort, medical and chemical plant design, renovation and construction
Ability to meet deadlines
Ability to make site inspections and supervision
High level of communication skills
High level of time management skills
WORK EXPERIENCE
Position:
Director
Organisation:
Weijen Lien Engineering Corporate, Taiwan
Duration:
July 2009 -
Duties:
Architectural and Interior Design
Construction Management
Chemical Plant Process, Design and Construction
Project Engineering Integration
Equipment, Reactor Design and Fabrication
Turnkey Contractor
Project Feasibility Study
Project:
1. Siliton Polys Corporate, Taiwan
2. Villa renovation, Taiwan
Position:
Contract Project Manager
Organisation:
Deh Yuan Industrial, Taiwan
Duration:
May 2006 -
Duties:
Chemical Plant Process and Engineering Design and Construction
Project Engineering Integration
Overseas Project Conductor
Project:
1.Gily Chemical Company, Taiwan
2.Chanda Chemical Company, Taiwan
3. Yuontsen Chemical Company, Taiwan
4. Pyridine & Pycoline Plant, China
5. Tomoegawa Corporate Japan, China
6. Huanfon Chemical Company, China
7. Lejoin Chemical Company, China
Position:
Vice President
Organisation:
Eva Care Group, California, USA
Duration:
October 2003 – May 2006
Duties:
Architectural / Construction Coordination
Hospital Renovation and Maintenance
Overseas Project Conductor
Project:
1. Greenfield Country Club, Bishop, CA, USA
2. Greenfield Care Center of Davis, Davis, CA, USA
3. Empress Care Center, San Jose, CA, USA
4. Greenfield Care Center of Fairfield, Fairfield, CA, USA
5. Greenfield Care Center of Fullerton, Fullerton, CA, USA
6. Greenfield Care Center of Grass Valley, Grass Valley, CA, USA
7. Greenfield Care Center of Jackson, Jackson, CA, USA
8. Montclair Manor Care Center. Montclair, CA, USA
9. Greenfield Care Center of Riverside, Riverside, CA, USA
10. Greenfield Care Center of Sacramento, Sacramento, CA, USA
11. Greenfield Care Center of San Bernardino, San Bernardino, CA, USA
12. Greenfield Care Center of South Gate, South Gate, CA, USA
13. 500 units Residential Development, El Salvador
14. Resort & Hotel Development, El Salvador
Position:
Project/Construction Manager
Organisation:
Deryuan Environmental Resource Recycle Development Ltd, Co., Shanghai, China
Duration:
March 2002 – July 2003
Duties:
Architectural Design
Construction and Equipment Coordination
P&ID Monitoring
Financial / Personnel Management
Marketing
Project:
1. Deryuan Environmental Resource Recycle Plant, China
Position:
Construction Manager
Organisation:
Baubcok Bosig Power, Germany
Duration:
March 2001 – February 2002
Duties:
Construction and Equipment Coordination
Project:
1. Yuangkang Resource Energy Recycle Power Plant, Taiwan
Position:
Lecturer
Organisation:
Engineering Dpt. Chongwha University, Taiwan
Duration:
February 2000 – January 2002
Duties:
Architectural Design
Position:
Architect
Organisation:
C H Ho International, Architects, Planners, and Engineers, Taiwan
Duration:
December 1997 - June 2000
Duties:
Administration manager
Co-ordination with international consultants
Construction manager
Project manager
Project:
1. The Seedz Shopping Centre 樹籽購物中心
2. The Promised Land Resort 理想大地渡假村
Position:
Contract Architect
Organisation:
Chonjen Shen Architects and Landscape Architects, Pty Ltd, Taipei,Taiwan
Duration:
August 1997 – December 1997
Duties:
Project coordinator
Projects:
1. A fifteen-story apartment block with 28 units, Taipei
Position:
Contract Architect
Organisation:
David Kearney and Associates, Architects and Landscape Architects, Brisbane, Australia
Duration:
June 1995 - August 1997
Duties:
Preparation of working drawings and detailed designs with CAD
Checking the design against statutory regulations
Projects:
1. Medical centre
2. Old age hostel
3. Child care centre
4. Factories and commercial buildings
5. Night club
6. Townhouses and apartments
Position:
Architect
Organisation:
Brand and Slater Pty Ltd, Brisbane, Australia
Duration:
January 1996 - July 1997
Duties:
Preparation of working drawings and detailed designs with CAD
Checking the design against statutory regulations
Co-ordination with consultants
Project:
1. Secondary school and medical centre
2. Redland RSL Club
3. Greenbank RSL Club
4. Townhouses and apartments
Position:
Architect
Organisation:
Habtech Architects Pty Ltd, Brisbane, Australia
Duration:
June 1994 - September 1995
Duties:
Discussion with client of the brief and preliminary drawings
Preliminary site investigations and evaluations
Preparation of schematic and design development drawings
Model making
Checking the design against statutory regulations
Formulation of cost estimates and feasibility studies
Preparation of 3D drawings, working drawings and detailed designs with CAD
Attending site meetings
Co-ordination with consultants
Projects:
1. A two-story complex with 12 units, Toowoomba, Queensland
2. A fourteen-unit townhouse complex, Forestlake, Queensland
3. A two-story house, Brisbane, Queensland
4. A ten-story apartment block with 28 units, construction cost was $5m, Auchenflower, Brisbane
Position:
Architect / Energy Consultant
Organisation:
U. T. David Group, Taipei, Taiwan
Duration:
February 1994 - April 1994
Duties:
Design development and working drawings of local hospital and office building complex
Co-ordination with medical equipment, mechanical and plumbing consultants
Interior design
Energy analysis
Project:
1. Renovation of local television studio and office building complex, Taipei, Taiwan
Position:
Director
Organization:
Weijen Lien Architectural and Interior Construction Ltd, Taipei, Taiwan
Duration:
December 1988 - October 1991
Duties:
Discussion with client of the brief and preliminary drawings
Preliminary site investigations and evaluations
Preparation of schematic and design development drawings
Working in liaison with medical equipment consultants
Formulation of cost estimates and feasibility studies
Preparation of working drawing and details design
Attending site meetings
Making site inspections
Issuing instructions and notices under the contract terms
Administration of variations, monetary allowances, and claims for certificates
Co-ordination with consultants
Management of a busy office
Preparation of budgets and implementation of accounting systems
Projects:
1. Interior design and construction of a new lighting manufacturing plant for Philips Taiwan Ltd, Kwanyin, Taiwan
2. Interior design and construction of new office building for Philips Taiwan Ltd, Taipei, Taiwan
3. Interior design and renovation of office building for IRE Electrical Appliances Ltd, Taipei, Taiwan
4. Renovation of dental clinics and local hospitals
Position:
Interior and Architectural Designer
Organisation:
Komos Interior and Architectural Design Construction Ltd, Taipei, Taiwan
Duration:
July 1986 - November 1988
Duties:
Preliminary site investigations and evaluations
Preparation of schematic and design development drawings
Model making for specific projects
Formulation of cost estimates and feasibility studies
Preparation of working drawings and details design
Attending site meetings
Making site inspections
Issuing instructions and notices under the contract terms
Co-ordination with consultants
Management and accounting systems in the office
Preparation of budgets and implementation of accounting systems
Projects:
1. Tang Mansion, 24 stories apartment, Taipei, Taiwan
2. Ming-Ger Office Building renovation, Taiwan
3. Jing-Mei Mansion, 21 stories apartment, Taipei, Taiwan
Position:
Site Supervisor
Organisation:
Independent Engineering Wing of the Sixth Field Army, R.O.C
Duration:
October 1984 - June 1986
Duties:
Preparation of working drawings and details designs
Site supervision
Project:
1. Heavy duty road and camouflage shield for battle tank, Taiwan
Position:
Draftsman (Part-time)
Organisation:
Komos Interior and Architectural Design Construction Ltd, Taipei, Taiwan
Duration:
June 1981 - September 1984
Duties:
Preparation of schematic and design development drawings
Model making
Referees
Mr Ajit Mangar
Director, Habtech Architects Pty Ltd, Taringa, Brisbane Australia
Telephone:+61 7 3374 2886
Facsimile:+61 7 3870 1921
Mr David Kearney
Director, David Kearney and Associates, Architects and Landscape Architect, Karana Downs, Qld Australia
Telephone:+61 7 3201 0354
Mr Peter Osborn
Director, Osborn Lane Pty Ltd, Consulting Engineers, Warwick, Qld Australia
Telephone:+61 7 4661 2399
Facsimile:+61 7 4661 5362
Mr John Slater
Director, Brand and Slater Architects Pty Ltd, Tingalpa, Brisbane Australia
Telephone:+61 7 3890 1266
Facsimile:+61 7 3890 1278
文章定位: